36,000 sf temperature and humidity controlled space for higher production in cold weather.
Cleaner environment.
Properly EPA permitted for both interior and exterior blasting and painting.
Facility specifically designed for high performance coatings application.
Fabrication Facility
Fabrication Plant
Chesnee, SC
• Complete Construction 2010
• Over 45,000 of assembly shop space in addition to material processing.
• Accomodates project sizes up to 15,000 tons.
• Plant on 33 acre site
• Double current capacity
• State of the Art - CNC Equipment
Drill / Saw Line / Coping
Plate Processing
Bar Coding systems
• Built to address Heavy Industrial Projects.
• Integrated 3-D modeling and fabrication software.
Engineering Office Executive park DR, Cincinnati , OH